The main wire rope hoist is suitable for carrying heavy loads at relatively fast speeds and is the primary means of vertical access for men and materials in an. Wherever an elevator for inspection, emergency, or interlevel hoisting is required in mines and underground shafts, the Alimak rack and pinion elevator is the. Raise climbing, widely known as the Alimak mining method after the company that introduced it, is a variation on longhole stoping developed.

Author: Netaur Faem
Country: Burkina Faso
Language: English (Spanish)
Genre: Art
Published (Last): 13 June 2018
Pages: 27
PDF File Size: 12.55 Mb
ePub File Size: 18.75 Mb
ISBN: 360-4-44014-186-4
Downloads: 15244
Price: Free* [*Free Regsitration Required]
Uploader: Tushakar

Review our range of underground mining services below. An alimak leaves its nest to climb into a raise Courtesy of Manroc Developments Inc.

This final step should be done in such a way that concerns about adjacent stope stability and hydraulic heads are addressed satisfactorily.

Alimak Production Mining, mine engineering, Alimak Raising, Lateral Development, Narrow Vein Mining

In a ‘time is money’ world, we ensure customers get materials and personnel transported higher, faster and safer. The broken ore often compacts slightly, resulting an effective swell of about one third its unbroken volume.

We have a solid reputation when it comes to employing the safest and most productive techniques available. Currently, we incorporate both conventional and mechanized production mining techniques, as determined by the individual requirements and overall complexity of each site. This step is done once the stope is completely blasted.

Manroc has worked with major mining firms around the world, and has built a solid reputation. Raise climbing, widely known as the Alimak mining method after the company that introduced it, is a variation on longhole stoping developed for narrow-veined, tabular ore bodies. Drawpoints can be driven from either footwall or hangingwall, depending on how the ore zone is accessed.

A World Leader

Less Dilution The production drill sits in the middle of its work, cutting the drilled length in half. Prospects good for long term copper price, despite current volatility Lack of major copper discoveries mean supply will likely fall short of demand in next decade.

The climber holds two to three people and the drilling and blasting equipment they need.

At Manroc, we have developed innovative solutions and highly specialized miningg making us a leader in narrow vein exploitation.

In theory, and if properly cabled, the foliated hangingwall could be approximated as a laminate beam by the Voussoir approach, as described by Hutchinson and Diederichs This type of mining is best suited to tabular narrow vein ore bodies with enough dip for gravity ore flow. Alima, Williams and Orica Ltd.

  J DUGUNDJI TOPOLOGY PDF

The blasts are timed to slash down, with the footwall holes often the last to fire. Now a typical Alimak stope is 80 or 90 metres alimam and mucked more often — an improvement for grade and scheduling.

Manroc Developments is a full service mine engineering company employing a highly qualified team of mining engineers and associates with extensive experience in ,ining mining. The holes are most often mechanically loaded with either ANFO or an emulsion explosive.

With less development, faster ore access, better ground control, and faster overall mining, it is easy to see how raise mining will cost less than regular open stoping. The aliak will be slashed out of the drawpoint backs if development is from the hangingwall side. Alimao has shown that the stopes mined with a raise climber tend to be more stable than regular longhole open stopes.

Raise Climber Mining Method Details The mininf climber mining method will generally be comprised of the following steps: The lens of interest stood metres away from historical infrastructure; with lateral development included, a metre-high stope at Seabee would have taken 16 to 18 months to mine out using longhole stoping. The elevator can be installed easily, and the cost is moderate because no machine room is needed. The bulk of mininb waste development required with this method is the ore zone access and the raise climber nests.

These drifts are driven from the shaft or established mining areas to the new ore zone. The climber nests are always in the hangingwall. Where required, the stope hangingwall can be supported with deformed strand resin-grouted cable bolts in a regular pattern along the raise. Stopes can be as little as 3 feet thick, or even less in alimai circumstances.

Our longhole stopes are approximately 5, to 10, tonnes, whereas the Alimak stopes are anywhere from 20, to 30, tonnes. Committed to safety and excellence, Manroc is at the forefront of Alimak mining, generating safer and more productive methods.

A ramp is not required and, in many cases, neither is the muck pass and ventilation raise of a regular stoping system.

Ground Control Experience has shown that the stopes mined with a raise climber tend to be more stable than regular longhole open stopes.

This should also contribute to a more stable hangingwall. The sub-horizontal production drill hole direction allows the use of the undercut as a slot and because of the increased stope height, there will be significantly fewer of these than there would be slots required for regular open stoping in the same area.

  ATLAS OF MANIPULATIVE TECHNIQUES FOR THE CRANIUM AND FACE PDF

Successful users of the technique have found that it accelerates their path to production by centring development work within the ore body. Claude Resources used Dumas Ltd. Alimak elevators are also used to provide a simple and economical means of connecting different levels further out in the tunnel system and for transporting men and material between the levels and the stopes.

Raise (mining)

Greg Dipple of UBC has discovered that certain mine tailings can be used for carbon sequestration, and the implications could be enormous. More Selectivity The short drill holes make this method very effective in narrow veins. A true innovation in underground mining, the Alimak method provides the highest safety standards in the industry, while increasing productivity, adding greater flexibility and maneuverability, and reducing overall mining costs.

It is better if the ore body is continuous over several hundred feet vertically. The graph abscissa see above figure is the hydraulic radius of the stope. With some exceptions, production blasting can start in miining quarter after raise development starts.

Teck installs first production-scale machine learning system Machine learning predicts when trucks will need maintenance at Fording River coal mine. Cable bolting zlimak better ground support from its position in the central hangingwall of the stope, and the broken ore adds support by putting outward pressure on raise walls. Strike length was also reduced from 15 to 14 metres after problems with hangingwall caving and dilution.

Raises must be driven big enough that a 2. Proven benefits and outside financial pressure push modular construction into the mining mainstream.

The main ore access is gained by driving a raise up dip along the centre of the stope hangingwall, rather than from over and under-cuts driven along strike, as is done with regular open stoping. The raise mining method takes advantage of this concept because, even though the hangingwall is only supported up its centre, the resulting two unsupported strips are long and narrow and are more likely to be self-supporting.

Avoiding repeat levels has slight time-saving effects during operation because it eliminates the further work, like fencing backfill, needed on each level. Drawpoints and Climber Nest: