EN 50126-3 PDF

Supersedes CLC/TR English version. Railway applications –. The specification and demonstration of. Reliability, Availability. BS PD CLC/TR Railway applications – The specification and demonstration of Reliability, Availability, Maintainability and Safety (RAMS) – Part 3. Buy CLC/TR Railway Applications – The Specification And Demonstration Of Reliability, Availability, Maintainability And Safety (rams) – Part 3.

Author: Nazragore Tekasa
Country: Switzerland
Language: English (Spanish)
Genre: Photos
Published (Last): 10 February 2013
Pages: 62
PDF File Size: 15.20 Mb
ePub File Size: 17.41 Mb
ISBN: 836-5-13370-485-3
Downloads: 91888
Price: Free* [*Free Regsitration Required]
Uploader: Donos

AFNOR Editions Online Store

The identification process is carried out to gain assurance that the rolling stock is correctly analysed and all the factors 5026-3 its RAM performance have been identified.

Worldwide Standards We can source any standard from anywhere in the world. The second bullet item is well explained within EN and, depending on the phases chosen, it also addresses the third bullet item. This website is best viewed with browser version of up to Microsoft Internet Explorer 8 or Firefox 3.

Carpeting and wall-to-wall 50126- flooring should be designed for easy replacement for cleaning off the rolling stock by providing appropriate breaks especially in the environments subject to heavy traffic corridors, vestibules, etc.

Dynabrade Product – 3″ (76 mm) Dia. Disc Pad, Hook ‘N Loop

Based on the above considerations, the RAM Programme 501263- be defined as shown in the following diagram. This maximum weight may be doubled when the conditions of accessibility make it possible for two persons to work together. According to the above mentioned definitions and conditions of failures, the Custom er should state: Affiliation List of ICS codes.

  KOKIN WAKASHU PDF

Guidance on Hazard Identification. Every breakdown structure 5026-3 be represented with a header containing at least the following: This should be considered to ensure that maintenance costs 550126-3 different operators or from different rolling stock Main Supplier are compared on the same equal basis. In particular as regards passenger vehicles and environments, textile coverings that can be cleaned efficiently should be used.

What is a hazard? In choosing the appropriate RAM Requirements, the Customer is strongly advised to consider the following: In this case only one choice can be considered: The completion of a suitable model is outside the scope of this guide 50216-3 the above information is useful to give an eb and to better introduce the RAM parameters for inclusion into an LCC model.

Installation User and Maintenance Manual. February Number of pages: If the real service operating time for the rolling stock and for its subsystems, assemblies and parts could not be measured, the Customer can choose, as appropriate, the following: Systems approach to safety, EN – 3: It should be noted that the Main Supplier is responsible for establishing the content of the RAM Programme, for the RAM Programme Plan and for submitting these documents to the Customer for acceptance within the timescale agreed by the parties, in accordance with System Quality Plan.

Railway applications — The specification and demonstration. The RAM documentation should be reviewed at this milestone to ensure that RAM activities are in step with design progress, RAM Requirements are being properly achieved and to examine any problems arising.

  MADURACION DE OSTWALD PDF

Any failure occurring on Rolling stock and leading, at least, to one of the following conditions: A minimum set of data is used to represent and to m anage the breakdown structure. Discover e Certification, assessment, diagnosis Get a quote for certification of systems, products or services, and get certified.

Using the above definition the Customer should specify the Reliability Targets for each one of the Failure Categories in terms of: The final goal is the derivation of 501263 targets through the appropriate analysis of all the information collected and organised in a structured way.

This guide deals with the application of RAM part of EN to sn stock only, as stated in the Scope and clarifies areas where EN could be misinterpreted.

BSpdf – Free Download PDF

MTBF in Hours, failure rate per million hours, or 5016-3 rate per million kilometres. It is therefore advisable, to identify all the entities that can be a part of this relationship and to examine how the responsibilities of dealing with 50126-33 entities are shared between the customer and supplier relationship. As an aid to establish “Skill Level Codes”, the following are suggested as examples: This application guide excludes: Specification for symbols for circuit diagrams.

Please fill this form, we will try to respond as soon as possible.

Back to top